Solar Feasibility Study
The Solar Feasibility Study will begin with Pure Energy Solar working with you to determine your project goals and defining a site-specific solution. Pure Energy Solar will then perform a detailed Solar Site Assessment and, finally, we will share our Photovoltaic Feasibility Assessment.
Phase I
Pure Energy Solar will begin with a Client Meeting to discuss:
- Project Goal Overview
- Projected Power Requirements
- Review of Potential Solar Sites
- Utility Interconnection Review
Phase II
Pure Energy Solar will continue with a detailed Site Assessment that includes:
- Inspection of the potential Solar Sites
- Pre-existing infrastructure review
- Site specific construction and safety logistics
Phase III
Pure Energy Solar will conduct a Solar Feasibility Study that will include:
- Site Assessment: A detailed inspection of the proposed location includes a visual inspection of available structures, roof conditions, safety concerns, logistics and other job related factors.
- Solar System Recommendation: Most Utilities offer a Net-Metering Agreement with their clients who produce power. In the event that that is not the case, then an Electrical Audit is performed to recommend a size of a solar system.
- Solar Access and Shade Assessment: An assessment of the total potential solar energy given the shading of a particular site will be provided. Identifying the shading pattern early in the process reduces the expense of system and improves the efficiency of the final system.
- Performance Reports: Using our solar experience, research from the National Renewable Energy Laboratory, and the Solar Access and Shade Assessment, Pure Energy Solar will be able to determine the projected performance of a solar system over time.